ABOUT FORMWORK
The Aluminium Formwork System ( Formwork are know as Bekisting in SEA) was Developed in the Late 1970s as a System for Low-Cost Housing Construction. They were use to Cast Concrete in Place, with Load Bearing Walls using Formwork of Aluminium Panels. The System is Reliable, Simple, Highly Adaptable and Cost Effective.
​
The System allows High Accuracy Concrete work that Results in Consistent Interior Fitting of Doors and Windows. It also Eliminates the Cost of Plastering by Giving the Concrete a Smooth of Finish. With these Flexibility, it has made Complex Architectural Designs Possible.
​
Aluminium Formwork System allows the Walls and Slabs to be Poured in the Same Operation for RCC Load Bearing or RCC Frames Multi-Storied Buildings. These Increase Efficiency and also Produced an Extraordinarily Strong Structure with Excellent Concrete Finish.
​
Due to its Consistency, it allows Plumbing and Electrical Fittings to be Prefabricated and Achieve Exact Fit when Assembled. Above all this, the Formwork System can be Erected without the Need of Cranes.
​
Benefits of Vector Formwork Systems for Building & Constructions
Quality & Consistent
Using High-Strength Aluminium Alloy and Bearings, the Results - Near Perfect Concrete Finishing.
Speed & Accuracy
Standardized Production, Ease of Assembly, Accurate Calculation. A 7-days 1 Floor Rate can be Achieve.
Cost Effective & Efficient
Lightweight Aluminium Panels are Easy to Carry, Install and Dismantle thus Lowering the Labour Cost.
Standardized & Systematic
Formwork Runs through Computer Design, Engineering Standardization and Modular.
Safe & Clean Site
All Panels and Accessories are Reusable and Follow Safety Standards.
Flexible & Adaptable
System can be Place Horizontally or Vertically, has High Adaptability on Architect's Design.
The Performance & Speed Advantages of Vector Formwork
Vector Formwork allows for Early Stricking by Removing the Mid Link Slab, Leaving the Prob Undisturbed as Backdrop.
​
(Vertical Panel can be Removed after 12 Hours & Horizontal Panels after 36 Hours.)

Efficiency of 7 days per Floor can be Achieved, Minimum of 3-4 floors can be Accomplish in a Month.​
​
All Structural Elements can be Cast in One Pperation.
(Walls, Columns, Beams, Slabs, Drops, Architraves, etc.)